Gridtrove
Back to shop
100kWh Three-Phase BESS — Commercial Grid-Tied Container Unit

SolarDirect

100kWh Three-Phase BESS — Commercial Grid-Tied Container Unit

$21999.99

In stock (3)21 day lead time
1
CEIEC 62109IEC 62619IEC 61000EN 50549

The SolarDirect 100kWh BESS (Battery Energy Storage System) is a fully integrated containerized three-phase energy storage solution for C&I behind-the-meter applications: solar + storage farms, EV charging hubs, microgrids, and demand charge management for facilities with >100kW peak loads. System overview: 100kWh LiFePO4 array (90kWh usable), integrated 50kW three-phase bidirectional PCS (Power Conversion System), centralized BMS, liquid cooling, FM200/Novec 1230 fire suppression, and SCADA-ready EMS. Grid specs: 400V/480V three-phase switchable, 50/60Hz, IEEE 1547 compliant. Power factor correction 0.9 leading to 0.9 lagging. Anti-islanding protection per UL 1741. SolarDirect provides remote commissioning; on-site commissioning available in TX, CA, AZ, FL. 10-year system warranty; 3500 cycles to 80% at rated capacity. ⚠️ Certification note: CE marked, IEC 62109, IEC 62619, IEC 61000, EN 50549 compliant. NOT currently UL 1741 SA listed — PCS is designed for UL 1741 SA certification (in roadmap). Confirm grid interconnection requirements with your local utility before ordering.

Specifications

cycles3500
pcs_kw50
phases3
coolingliquid
grid_hz50/60
chemistryLiFePO4
ems_scadatrue
usable_kwh90
form_factor20ft container
capacity_kwh100
communicationModbus TCP/IP,IEC 61850,OCPP 1.6,DNP3
grid_voltage_v400/480
fire_suppressiontrue